We were delighted to be commissioned to work on this large historical project incorporating seven working fireplaces. We worked very closely with the client, architect and contractors to ensure that all products installed balanced the need for modern heating solutions, building control / HETAS compliance, whilst keeping the historical essence of the property at the forefront of design decisions.
Boleskine House in conjunction with Simpson Builders Ltd

Overview
Our Approach
A project of this scale calls for precise planning and strong organisation to keep everyone moving toward the deadline. Handling premium products can also be demanding, as any damage may result in significant costs. For this reason, great care is taken on these sites to ensure every item is well-protected and transported with precision. Here, Tom, Neil, and Martin’s wealth of experience in delivering high-end projects made all the difference. Over the span of 2 – 3 months the full installation team successfully lined chimneys, laid bespoke designed hearths, fitted fireplaces, connected and commissioned stoves.
Installation
Each room had a schedule to work to and our programme of works was very detailed.
The Oratory – Egyptian fireplace
One of the more intricate challenges on this project was the stone work. The clients had very detailed specifications for the hearths requiring cored holes for spot lighting to be fitted. This had to be exacting with no room for tolerances. The Dining Room had a very ornate expensive fireplace to be fitted. Fireplaces come in sections and need to be carefully positioned to ensure they fit together accurately.
The Library
The joiners at Simpsons builders carried out the specialist installation of the intricate paneling and fireplace. Co-ordinating our works is always a challenge, but through good communication with the site managers we all worked well as a team to see the project through to its completion. The study had an ornately carved wooden surround that needed to be carefully fitted. Once installed Neil had to tile the fireplace before connecting up the stove. The Bar required a more classic surround to be fitted with reeded panels. This was one of the more straightforward fireplaces. Again the fireplace came in sections and once pieced together we needed to fill the gaps with grout.
Results
The fireplaces look fantastic and we would highly recommend a visit to Boleskine House. It was a pleasure to work for Simpsons Builders Ltd who always add a level of finesse to their projects.
The Great Hall- Chesneys Salisbury Double sided Woodburner

Dining Room – Chesneys Salisbury Double sided Woodburner

The Oratory- Stovax Huntingdon 30

The Library – Stovax Stockton 11

The Study – Stovax Stockton 8

The Bar – Stovax